Boyndie Wind Farm, north coast of Aberdeenshire between Portsoy and Banff
The application was submitted and granted in April 2009. Construction work began in May 2009 and became fully operational in February 2010.
This additional turbine has increased the capacity of the wind farm to 16.30MW (Total 8 Turbines).